Design, supply and installation of all production equipment and networks distribution by armorinox systems, compressed air, steam and condensates, osmotic water, hot water at 80º C and 45º C, water for pressure washing (25 bar), vacuum systems, air conditioning and fire protection systems. It is a new 4 storey building within the food complex of El Pozo in Alhama de Murcia.